SACO Commercial Construction

Building the foundation and paving the way for tomorrow

SACO Construction Inc. | 1610 Professional Blvd., Suite F | Crofton, MD | 410.451.7445  

COMPANY PROFILE
CAPABILITIES
PROJECT FILES
AWARDS
CAREER OPENINGS
SACO SAND & GRAVEL
DIRECTORY
REFERENCES
SAFETY
CONTACT

Heavy Machinery

SACO CONSTRUCTION PROJECT FILES

Below are only a few of the many projects in progress or completed or by SACO Construction Inc. in the Baltimore, Washington D.C. Metro area. For a complete listing, or for more information regarding project details, please contact us directly.

RITCHIE STATION MARKETPLACE C4ISR CONSOLIDATED NORTH
Ritchie StationSACO is the construction manager for all 3 phases of the infrastructure work. The work included moving nearly 1.8 million cubic yards of earth at this 100+ acre site, clearing, sediment and erosion control, 7,000 feet of cast in place masonry, retaining walls MORE » Consolidated NorthThe project included disposal of 60,000 cubic yards of earth, clearing, sediment and erosion controls, water main, sanitary sewer, storm drainage, and asphalt paving. All work takes place within the strict security requirements MORE »
HALL STATION DEVELOPMENT
GM PLANT - BALTIMORE
Hall StationProject has included the infrastructure construction including the grading, water, sewer and storm drain, site amenities including perimeter masonry wall, site lighting, hiker/biker trails with fitness stations and landscaping MORE » GM Plant180 acre site 500,000 cubic yards of earth to be moved. Current scope includes- Mass Grading MORE »
CLINTON INDUSTRIAL PARK FAIRFIELD INN MARRIOT
Clinton Industrial17 acre site 45,000 cubic yards of earth to be moved. Current scope includes- Mass Grading, Storm Water Management, Water and Sewer, Paving, Curb and Gutter, and Road Widening. MORE » Fairfield Inn Marriot3-4 acre site approx. 35,000 cubic yards of earth to be removed from site. Current scope includes- Mass Grading, Retaining Wall MORE »
COLLEGE HEIGHTS NATIONAL CANCER INSTITUTE
College Heights25 lot housing project which incorporated the use of keystone retaining walls to manage grade changes from adjacent parcels and substantial storm drain clean water diversions to avoid disturbance from runoff from neighboring properties. This project also required the extension of municipal water and sewer to service each lot. MORE »

National Cancer InstituteThe work consists of excavation for the new headquarters building and a multilevel parking garage. Approximately 30,000 cubic yards of earth will be removed and the existing storm water management pond will be drained and reconfigured to create more capacity for runoff. MORE »

FDA CENTRAL UTILITY PLANT JOHNS HOPKINS - APPLIED PHYSICS LAB
FDA Central UtilityProject consists of installation and maintenance of sediment/erosion controls, clearing, demolition of existing pavements, grading, and wall backfills. MORE » Johns Hopkins Applied Physics LabDemolition existing underground infrastructure, site grading, new storm drain, sanitary sewer, and water main. The construction of the proposed underground utilities required working around existing fiber optic and electrical service. MORE »
US NAVAL ACADEMY HTWH SYSTEM FDA NORTH GARAGE
SACO Construction was awarded the Washington Contractor Award for this project which consisted of excavation and replacement of the heat transfer units for the Naval Academy campus in Annapolis MD MORE » Scope of work included demolition, excavation, sediment erosion control and off site disposal MORE »
ADDISON ROAD
Site Demolition and Grading MORE »
WASHINGTON ADVENTIST UNIV. SCHOOL OF MUSIC ANDREWS FEDERAL CAMPUS
Washington Adventist ExcavationSACO’s work consists of installation and maintenance of sediment/erosion controls, clearing, demolition of existing site features, building excavation and backfill, and site grading. The project is a prime example of SACO’s ability to perform work on a facility that must remain operable during the building operations with minimal impact to the day to day functions. MORE » The proposed site consists of developing an old industrial site into a business park which will serve as a secured facility specifically designed towards government agencies and contractors. The Owner has contracted SACO Construction, Inc. to complete the entire infrastructure serving the first parcel being developed scheduled for delivery in early 2012. MORE »
LIBRARY OF CONGRESS BOOK STORAGE PRINCE GEORGE'S COUNTY ROAD CONSTRUCTION
This 5 acre site located at Fort Meade required clearing, demolition, sediment control and grading for the 82,000 sq. ft. office and storage facility which archives books and publications for the Library of Congress in Washington D.C. MORE » SACO was contracted to construct a road in Prince George's County Maryland MORE »
"SQUARE 320" WASHINGTON DC SANDY HILL LANDFILL
Scope of work included sediment control and mass excavation MORE » Installation of roads, regrading, installation of a new pumping station, in addition to working with Waste Management to divert methane gas to NASA for heating and electricity MORE »

 

  © SACO Construction Inc. | Web Design & Development by Marketing House  COMPANY PROFILE | PROJECTS | AWARDS | SAND & GRAVEL | CONTACT